Architect or engineer using pencil and protractor working on blueprint, architectural concept

RFID:Image ID:P9J2RB
Image details
Contributor:
Suriyan TejasurintrImage ID:
P9J2RBFile size:
51.3 MB (840.2 KB Compressed download)Releases:
Model - no | Property - yesDo I need a release?Dimensions:
5184 x 3456 px | 43.9 x 29.3 cm | 17.3 x 11.5 inches | 300dpiDate taken:
2 April 2017