17³Ô¹ÏÔÚÏß

Student Works on Robotics Project and Uses Tablet for Programming and Control

Student Works on Robotics Project and Uses Tablet for Programming and Control Stock Photo
Preview

Image details

Contributor:

Prostock-studio

Image ID:

3DR96W9

File size:

57.8 MB (1.2 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5601 x 3608 px | 47.4 x 30.5 cm | 18.7 x 12 inches | 300dpi

Date taken:

17 February 2026

More information:

A young student sits at a wooden table with a tablet in hand. Two robot models are present on the table. One robot has visible wires and components.